Our policy in four commitments — what we work to, how we work, what we prove, and what we promise you.
Standards
Machines are designed and built to applicable requirements for the destination market, including CE and other relevant requirements.
Welding schedules follow recognised RWMA/EN practice, adapted to the customer’s material.
Electrical assemblies use named, traceable suppliers.
Documentation is issued in the language of the operating team.
Processes
A single engineering owner follows a project from enquiry to commissioning.
Every machine is built from released drawings, not from shop-floor improvisation.
Changes during the project are recorded against the order.
Commissioning and service visits are documented per serial number.
Where provided, machines are designed in full compliance with the customer’s specifications.
Tests
Every machine runs real weld schedules on real material before dispatch.
Electrical safety and cooling circuits are checked under load.
Results are recorded against the order and handed over with the machine.
Sample welds are evaluated with the customer where the application requires it.
Commitments
We say what a machine cannot do before the order, not after.
Spare parts remain available for the life of the machine.
Support answers in the customer’s own language.
Continuous improvement is driven by service findings, not by marketing.
Our pledge
If a machine we built does not hold the weld quality it was sold for, we come back and make it right — whether it left the factory last month or twenty years ago.
How we build quality in
In-house manufacturing
All chassis welding, machined parts, assembly and electrical installation are completed in our own production facility, with every stage carefully inspected.
Tested before dispatch
Every machine runs real weld schedules on real material before it is packed. Results are recorded against the order. Every machine we manufacture undergoes preliminary and final acceptance with our customer taking part.
Traceable components
Our own transformers, control units and other equipment, together with components sourced from our suppliers, are recorded by serial number.
Documented after-sales
Commissioning reports, service visits and retrofits are recorded, so a machine built decades ago still has a history.
THE QUALITY PROCESS
Six gates between an enquiry and a machine in production.
01Application review
Material, thickness, coating and cycle time are assessed against the weld schedule before anything is quoted.
02Design release
Mechanical and electrical drawings are released; nothing is built from a verbal change.
03Manufacturing
Machining and welded frames are produced in-house and checked against the released drawings.
04Electrical assembly
Cabinets, transformers and wiring are assembled and function-tested under power.
05Weld testing
Real weld schedules are run on real material; results are recorded against the order.
06Commissioning
Installation, operator training and acceptance on site, with the report filed per serial number.
THE QUALITY LIFECYCLE
Quality does not end at dispatch — service findings come back into design.
1Design
Weld schedule and machine concept
2Build
In-house machining and assembly
3Test
Weld and safety verification
4Operate
Production with recorded parameters
5Service
Maintenance, spares and retrofit
6Improve
Findings feed the next design
Every service visit is recorded per serial number, so a recurring finding changes the next machine we build — not only the one we repair.
TEST PROCESSES
What is verified before a machine leaves the factory.
TestMethodRecord
Weld schedule testReal weld schedules run on the customer’s own materialParameters and sample results recorded against the order
Electrical safetyInsulation, earthing and protective device checks under powerTest result filed with the machine documentation
Cooling circuitFlow and leak check under load at the rated duty cycleFlow values noted in the commissioning report
Mechanical functionStroke, force and cycle repeatability over continuous operationForce setting handed over with the machine
Certificates & declarations
Certificates and declarations are sent on request.
Documents available on request
Contact our team to request our CE declarations and quality certificates in the format you need.